Skip to content

Free estimate, with the city paperwork sorted out first: (972) 433-9803

Richardson · Plano · Garland · Allen

(972) 433-9803
Single-story brick ranch house with a new dark brown shingle roof, ladder against the eave, and shingle bundles and a toolbox in the driveway

ServicesKitchen Remodeling

Kitchen Remodeling in Richardson

We remodel kitchens the way the inspector expects to see them. We pull the permit and run new circuits and plumbing to current code. Then we vent the hood outside and get each inspection signed off before anything gets covered up.

A kitchen remodel is mostly what's behind the walls

The parts you see get the attention. The parts that pass or fail inspection are the wiring, the drain lines, the gas line and the duct for the range hood. That's where we spend our time.

Plenty of homes here were built decades ago. Their kitchens were wired for a fridge and a toaster, not a microwave drawer, an induction range and a dishwasher running at the same time. When you change the layout or add appliances, the city expects the new work to meet today's code, not the code from when the house was built.

We treat every kitchen remodel as an inspected job from day one. You get a plan that shows what changes and what the inspector will check. No one comes back later asking why the work was never signed off.

What the work covers

Layout and planning
We measure the room and talk through how you cook. Then we sketch where the sink, range and fridge go. If moving something means new drain or gas runs, we tell you up front.
City paperwork
We pull the building permit and list the trades involved. You don't have to stand in line at the city.
Electrical to current code
Kitchens need two 20-amp small appliance circuits for the counters, GFCI protection at the outlets and dedicated circuits for appliances like the dishwasher and disposal. We check your panel has room before we promise any of it.
Plumbing and gas rough-in
We run supply lines, drains and vents for the sink and dishwasher. Gas lines get pressure tested before the inspector sees them.
Range hood venting
A hood has to duct to the outside, not into the attic. We come from roofing, so we know how to run that duct through a wall or roof and seal it so it doesn't leak. Larger hoods can also trigger makeup air rules, and we size for that.
Cleanup and final walk
We sweep up each day and haul off demo debris. At the end we walk the kitchen with you and hand over the final sign-off paperwork.

Signs your kitchen needs more than a refresh

  • Breakers trip when you cook

    If the microwave and kettle can't run together, the circuits are overloaded. That's a wiring problem, not a nuisance.

  • Outlets with no GFCI

    Older kitchens often have plain outlets near the sink. Those are a shock risk around water.

  • The hood vents nowhere

    Recirculating hoods or ducts that end in the attic push grease and moisture where they don't belong. Over time that can stain ceilings and draw pests.

  • Slow drains and soft spots

    A sink that drains slow or a floor that feels spongy by the dishwasher can mean an old leak. We open it up and show you what we find.

  • A layout that fights you

    If you walk around an island to reach the sink every time, moving things is worth pricing out. It's usually plumbing and wiring that set the cost.

How a kitchen job runs

  1. 1

    Free estimate at your home

    We look at the kitchen, the panel and the attic or wall where the hood will vent. You get a written estimate that lists each part of the work.

  2. 2

    City approval and schedule

    Once you give us the go-ahead on the phone, we file the permit with the city. When it's approved, we give you a schedule and tell you which days you won't have water or a working stove.

  3. 3

    Demo and rough-in

    We protect the floors and paths through the house, then open the walls. New wiring, plumbing, gas and ductwork go in.

  4. 4

    Rough-in inspection

    The city inspector checks everything while the walls are still open. Nothing gets closed up until it passes.

  5. 5

    Finish and final inspection

    Fixtures and appliances get connected and tested. After the final inspection passes, we clean up and walk through the kitchen with you.

Roofer and homeowner review a tablet photo of damaged shingles in the front yard of a brick ranch home while a worker tears off the roof behind them

What moves the price

Every kitchen is different, so we price it after we've seen it. The biggest swings come from how much changes behind the walls. Here's what we look at.

Moving the sink or range
Keeping things where they are costs less. Moving a sink to an island means new drains and venting under the floor or slab.
Panel capacity
New circuits need room in the panel. If yours is full or outdated, that work gets added to the job.
Hood duct route
A short run through an outside wall is simpler than a long run through the attic and roof. Bigger hoods may need makeup air too.
What we find inside
Old wiring, past leaks or rot under the sink show up once walls open. We stop, show you photos and price the fix before going ahead.
City fees
Filing and inspection fees are set by the city and depend on the scope. We list them in the estimate so they don't surprise you.

Kitchen remodeling questions

Something not covered here? (972) 433-9803

Do I really need a permit for a kitchen remodel?

If you're adding or moving circuits, plumbing, gas or a vented hood, yes. Work done without one can cause trouble when you sell or file an insurance claim. We pull it as part of the job.

Who meets the inspector?

We do. We schedule the rough-in and final inspections and are there when the inspector comes. If anything needs a fix, we handle it and get it rechecked.

Can we live at home during the remodel?

Most people do. You'll be without a working kitchen sink and stove for part of the job, so plan for simple meals. We keep a clean path through the house and close off the work area to cut down on dust.

How long will it take?

It depends on how much moves and how quickly inspections get scheduled. Once we've seen the kitchen, we give you a schedule with the rough-in and final inspection points marked so you know what to expect.

Can my range hood vent into the attic?

No. Code requires it to go to the outside. We run the duct through an exterior wall or the roof and flash it so it stays watertight.

Do you work outside Richardson?

Yes. We take kitchen jobs in Plano, Garland, Allen and other nearby towns. Ask when you call and we'll let you know.

Ready to plan your kitchen

Tell us what bugs you about the kitchen you have now. We'll come look, check the wiring and venting, and give you a written estimate at no charge. If you're also planning a bathroom, we handle bathroom remodeling the same way.